§ 01 — PROJECT

1099 Rosse Ave, New Milford, 07646

HVAC

Posted 3/28/2026

Build Plans

Build Phase

Planning
Foundation
Framing
Rough-in
Drywall
Finishes
Final
Complete

Scope

HVAC rough-in and installation for 2-story addition to existing single-family home. Approximately 2,500 SF of conditioned space across first floor addition and new second floor. Work includes attic-mounted high-efficiency direct-vent gas furnace on dedicated 2x6 platform per plans, full supply and return ductwork for both floors, refrigerant line set for exterior AC condenser, thermostat wiring, and roof venting. Gas line connection from existing meter. Full construction drawings available by clicking on image previews above.

Deadline

Apr 30

Notes

Residential addition and full renovation now proceeding as new construction following complete interior demolition. Foundation work for the addition is underway, with footings scheduled and structural work to follow. Scope includes new framing, MEP systems, windows and doors, interior finishes, and exterior improvements. Licensed and insured subcontractors invited to bid per trade scope. Estimated construction: March 2026 – October 2026 Plans and specifications available in the plan room.